Products / UPS & Telecom Backup
LiFePO4 drop-in replacement battery

Representative product form. Final enclosure, connector and labeling follow the approved specification.

UPS & Telecom Backup

UPS Backup Power Supply for Renewable Energy Systems

Backup battery configuration for UPS, telecom and critical power systems. Specifications shown are a reference baseline and can be reviewed for OEM requirements.

Project TypeOEM and B2B supply
CustomizationElectrical and mechanical
Discuss This Requirement
Reference Specification

Starting point for engineering review

Final specifications, cell selection, BMS limits and compliance documents depend on the confirmed application and order requirements.

Model
SP-24V-2KW
Nominal Voltage(Vdc)
25.6
Nominal Capacity
50.4Ah
Series and Parallels
8S14P
Max. Continuous Output Current(A)
75
Max. Continuous Output Power(kW)
2
Charging voltage(Vdc)
29.2
Output Voltage of Battery Pack(Vdc)
20~29.2
Charging current
0.5C(max) , 0.2C(typical)
Recommend charge operation temperature range
0~45
Output Protection
Fuse
Typical Recharge Time(90%capacity)
2~2.5hours@25A, 5hours@10A
Typical Discharge Time
35min@2kW ,70min@1kW,105min@0.5kW
Typical Life Time
3~8 years,depending on the usage

Build this platform around your equipment.

Start with a reference model or send a completely new specification.

Request Engineering Review